The price of a temporary cold mix is a great, big, loud sucking drain on your budget. But this continues to be how most crews handle utility-cut reinstatement: by throwing money in a ditch. It’s a colossal waste of labor, equipment, and overhead.
There’s a better, faster way that can cut your budget by as much as 50%. Want the first repair to be the last repair? Meet EZ Street cold asphalt. As good as a hot mix for utility-cut reinstatements, it cuts the cost of every single job and is guaranteed permanent.